this is a discussion within the Everything Else Community Forum; A toothpaste factory had a problem. They sometimes shipped empty boxes without the tube inside. This challenged their perceived quality with the buyers and distributors. Understanding how important the relationship with them was, the CEO of the company assembled his ...

Like Tree4Likes
  • 4 Post By WhoDat!656

Closed Thread
 
LinkBack Thread Tools Display Modes
Old 09-05-2014, 10:28 PM   #1
10000 POST CLUB
 
Join Date: Nov 2010
Location: Shreveport,Louisiana
Posts: 16,063
The Value of Engineering or common sense!

A toothpaste factory had a problem. They sometimes shipped empty boxes without the tube inside. This challenged their perceived quality with the buyers and distributors.

Understanding how important the relationship with them was, the CEO of the company assembled his top people. They decided to hire an external engineering company to solve their empty boxes problem. The project followed the usual process: budget and project sponsor allocated, RFP, and third-parties selected. Six months (and $8 million) later they had a fantastic solution - on time, on budget, and high quality. Everyone in the project was pleased.

They solved the problem by using a high-tech precision scale that would sound a bell and flash lights whenever a toothpaste box weighed less than it should. The line would stop, someone would walk over, remove the defective box, and then press another button to re-start the line. As a result of the new package monitoring process, no empty boxes were being shipped out of the factory.

With no more customer complaints, the CEO felt the $8 million was well spent. He then reviewed the line statistics report and discovered the number of empty boxes picked up by the scale in the first week was consistent with projections, however, the next three weeks were zero! The estimated rate should have been at least a dozen boxes a day. He had the engineers check the equipment, they verified the report as accurate.

Puzzled, the CEO traveled down to the factory, viewed the part of the line where the precision scale was installed, and observed just ahead of the new $8 million dollar solution sat a $20 desk fan blowing the empty boxes off the belt and into a bin. He asked the line supervisor what that was about.

“Oh, that,” the supervisor replied, “Bert, the kid from maintenance, put it there because he was tired of walking over, removing the box and re-starting the line every time the bell rang.
Danno, mleg1972, QBREES9 and 1 others like this.

"A Veteran is someone who, at one point in his life, wrote a blank check made payable to "The United States of America" for an amount of "up to and including my life."
WhoDat!656 is offline  
Old 09-09-2014, 01:26 PM   #2
Moderator
 
Join Date: Sep 2007
Location: New Haven Ct
Posts: 23,985
Re: The Value of Engineering or common sense!

LOL, so where is BERT and the line supervisor today.
QBREES9 is offline  
Old 09-11-2014, 07:23 AM   #3
Resident Swede
 
Join Date: Sep 2005
Location: Märsta, Sweden
Posts: 8,025
Re: The Value of Engineering or common sense!

Or you could just remove the box alltogether.
Crusader is offline  
Old 09-11-2014, 08:53 PM   #4
10000 POST CLUB
 
Join Date: Dec 2009
Location: Cypress Tx.
Posts: 19,027
Re: The Value of Engineering or common sense!

Originally Posted by Crusader View Post
Or you could just remove the box alltogether.

Then what would the fan blow?